Perencanaan Sinyal Lampu Lalu Lintas Persimpangan Tiga Lengan Pada Jl.Tanjung Raya II "“ Jl. Panglima Aim Kota Pontianak

Authors

  • Heri Azwansyah
  • Ferry Juniardi

DOI:

https://doi.org/10.26418/elkha.v7i1.12049

Abstract

Abstract"“ This study aim to plan traffic light at intersection three arm of Tanjung Raya II Street "“ Panglima Aim Street in Pontianak City.

This Study require data of intersection geometric and vehicle traffic obtained of field survey.

This study yield planning of traffic light 2 phase with cycle time 78 second. Green time of actual for phase 1 (Street of Panglima Aim) equal to 22 second, and for phase 2 ( Sreet of Tanjung Raya II) equal to 42 second.

Keywords"“ Traffic Light, Cycle Time, Green Time.