Reliability Analysis of Biomass Power Plant Using Loss of Load Probability Index at PT. Tanjung Buyu Perkasa Plantation

Authors

  • Muslimin Muslimin Electrical Engineering Study Program, Universitas Mulawarman, Samarinda
  • Tantra Diwa Larasati Electrical Engineering Study Program, Universitas Mulawarman, Samarinda
  • Agung Tandiminanga Electrical Engineering Study Program, Universitas Mulawarman, Samarinda

DOI:

https://doi.org/10.26418/elkha.v15i2.68481

Keywords:

Biomass power plant, forced outage rate, loss of load probability, reliability

Abstract

The main function of a power generation system is to provide reliable electrical energy. This study aims to determine the reliability of Biomass Power Plants at PT. Tanjung Bayu Perkasa Plantation (PT. TBPP) in the years 2020, 2021, and 2022 using the Loss of Load Probability (LOLP) index calculation method. LOLP is a reliability index that indicates the possibility that the power plant cannot meet the demand. The LOLP of biomass power plants at PT. TBPP in 2020 amounted to 1.2769 days per year. However, the LOLP in 2020 does not comply with the standards set by the Republic of Indonesia Minister of Energy and Mineral Resources Decree in 2018. In contrast, in 2021, it was 0.53403 days per year, and in 2022, it was 0.41748 days per year, both of which meet the standards of the Republic of Indonesia Minister of Energy and Mineral Resources Decree in 2018. The LOLP is affected by the Forced Outage Rate (FOR) and demands exceeding the capacity. Based on the LOLP of biomass power plants at PT. TBPP in 2020, 2021, and 2022, it can be concluded that the reliability of biomass power plants at PT. TBPP is at a higher level of reliability compared to the micro-hydro power plant in Pantai Baru Pandasimo with a LOLP of 51.3627 days per year and the steam power plant at Pertamina EP Asset IV Field Sukowati with LOLP of 4.259535 days per year. The recommendation for future research is to explore ways better to optimize boiler operations in steam power plants at PT. TBPP.

Author Biographies

Muslimin Muslimin, Electrical Engineering Study Program, Universitas Mulawarman, Samarinda

Ir. Muslimin, S.T., M.T., IPM., ASEAN Eng

Bid. Keilmuan :Sistem Ketenagalistrikan

Tantra Diwa Larasati, Electrical Engineering Study Program, Universitas Mulawarman, Samarinda

Tantra Diwa Larasati, S.T., M.T

Bid. Keilmuan : Teknik Kimia

References

M. Supari, Joko, and R. P. Wanarti, Teknik Pembangkit Tenaga Listrik, Jilid 1, Pembangkit. Jakarta: Direktorat Pembinaan Manajemen Menegah Kejuruan, 2008.

A. Tanjung, M. P. Halilintar, and D. I. Panjaitan, “Analisis Efisiensi Penggunaan Energi Listrik pada Pengolahan Kelapa Sawit di PT. Dian Anggara Persada,†in Prosiding SENKIM:Seminar Nasional Karya Ilmiah Multidisiplin, 2022, vol. 2, no. 1, pp. 103–117.

M. Muhamad and H. Saptyaji, “Audit Energi Listrik dan Boiler Pabrik Kelapa Sawit Kapasitas 60 Ton/Jam,†Agro Fabr., vol. 2, no. 1, pp. 16–23, 2020.

H. E. Fatkrisman, “Analisis Kebutuhan Daya Listrik di PT. Able Commodities Indonesia,†J. Compr. Sci., vol. 2, no. 2, pp. 597–609, 2023.

T. BSE, Instalasi Motor Listrik, 1st ed. Jakarta: Buku Sekolah Elektronik (BSE), 2014.

A. Ulil and S. D. Yayan, “Upaya Peningkatan Indeks Keandalan Sistem Pembangkit Dengan Peningkatan Kapasitas Sitem Pembangkit,†Jom FTEKNIK, vol. 6, no. 2, pp. 1–6, 2019.

K. I. Yulius and P. A. Anindya, “Loss of Load Probability (LOLP) Index untuk Menganalisis Keandalan Pembangkit Listrik,†in Prosiding Seminar Nasioanl Matematika dan Pendidikan Matematika UMS, 2015, pp. 582–588.

R. A. Putra, I. T. Yuniahastuti, and R. D. Laksono, “Skenario Perbaikan Nilai Keandalan Loss of Load Probability pada PLTH Pantai Baru Pandansimo,†ELECTRA Electr. Eng. Artic., vol. 2, no. 1, pp. 16–22, 2021.

P. K. Pranata, K. U. Three, A. Widi, and W. Mahendra, “Perhitungan Nilai Loss of Load Probability ( LOLP ) pada PLTG PT PERTAMINA EP Asset IV Field Sukowati Menggunakan Perhitungan Discrete Distribution dan Cholesky Decomposition,†J. Tek. Elektro, vol. 10, no. 3, pp. 639–648, 2021.

Menteri ESDM RI, “Keputusan Menteri Energi dan Sumber Daya Mineral Nomor 1567 K/21/MEM/2018 tentang Pengesahan Rencana Usaha Penyediaan Tenaga Listrik PT PERUSAHAAN LISTRIK NEGARA (PERSERO) TAHUN 2018 S.D. 2027â€.

E.Radwitya, Akhdiyatul, Y.Chandra " Analisis Teknis dan Ekonomis Dalam Penggunaan Bahan Bakar Biomassa Di Pusat Listrik Tenaga Uap Studi Kasus di PLTU PT. Suka Jaya Makmur " ELKHA, Vol.10, No.2, Oktober 2018, pp 49-55.

C. Adrianus, Junaidi, and Purwoharjono, “Studi Keandalan Pembangkit Listrik Tenaga Diesel (PLTD) Sukaharja Kabupaten Ketapang,†J. Tek. Elektro Tanjungpura, vol. 2, no. 1, 2019.

B. Roy and A. N. Ronald, Reliability Evaluation of Power Systems, 2nd ed. New York: Plenum Press, 1990.

B. L. Nathaniel, P. Yonantan, S. Y. Rompon, P. T. Tiku, M. L. J., and R. A. Robert, “Analisa Indeks Keandalan Sistem Pembangkit Listrik Pulau Miangas,†in Prosiding Seminar Nasional Produk Terapan Unggulan Vokasi Politeknik Negeri Manado, 2022, vol. 1, no. 2, pp. 24–33.

N. P. Vijayamohanan, “Loss of Load Probability of a Power System Fundam,†J. Fundam. Renew. Energy Appl., vol. 5, no. 1, pp. 1–7, 2015.

D. Marsudi, Operasi Sistem Tenaga Listrik, 3rd ed. Yogyakarta: Graha Ilmu, 2006.

Downloads

Published

2023-10-23

Issue

Section

Vol. 15 No. 2 October 2023