SOLAR PV-DIESEL HYBRID SYSTEM FOR THE NANGA MAN VILLAGE

Authors

  • Dandy Putra Wibowo Tanjungpura University
  • Muhammad Ismail Yusuf Tanjungpura University
  • Ayong Hiendro Tanjungpura University

DOI:

https://doi.org/10.26418/telectrical.v2i1.78914

Keywords:

Energy Potential, Hybrid Energy System, HOMER

Abstract

PLN finds it difficult to meet the electricity needs of the entire Indonesian population. Therefore, it is necessary to develop and optimize New Renewable Energy (EBT) such as solar energy, ocean energy, geothermal, and hydropower. This research uses secondary data that can be accounted for and uses Homer Energy Modeling software to analyze the use of available energy. This research analyzes the planning of a hybrid power plant that uses diesel and solar to meet energy needs in Nanga Man Village from an economic perspective. From the simulations conducted, the analysis results show that the configuration of solar panels - inverter - grid in the on-grid system results in a total overall cost of Rp8,280,976,634.66.

References

M. Bachtiar, “Prosedur perancangan sistem pembangkit listrik tenaga surya untuk perumahan (solar home system),†2006.

Peraturan Pemerintah No. Perpres No. 79 Tahun 2014. Indonesia. Kementerian ESDM, “Peraturan Pemerintah No. Perpres No. 79.â€

J. Indrawan, K. H. Khwee, and A. Hiendro, “). Perencanaan Pembangkit Listrik Hibrida Angin–Biomassa–Diesel–Surya Di Desa Penjernang, Kecamatan Sungai Tebelian, Kabupaten Sintang, Kalimantan Barat,â€. Jurnal Teknik Elektro Universitas Tanjungpura, 2022.

S. H. Hidayat, “Pengolahan Sampah Hybrid PLTS Menjadi Energi Listrik di Kelurahan Pondok Kopi,†KILAT, vol. 10, no. 2, pp. 235–248, 2021.

T. S. Mehang, M. Santoso, and Y. Tanoto, “Studi perencanaan pembangkit listrik tenaga surya (PLTS) Di kecamatan Ngadu Ngala, Kabupaten sumba Timur, NTT,†Jurnal Teknik Elektro, vol. 10, no. 1, pp. 1–10, 2020.

A. M. Ariawan and N. Sinaga, “Perencanaan Pembangunan Plts Hybrid Di Pondok Pesantren Al-Anwar 4 Serang, Kabupaten Rembang, Provinsi Jawa Tengah,†Jurnal Sains dan Teknologi Reaksi, vol. 19, no. 1, 2021.

A. Erliansyah and A. Hiendro, “Performansi Sistem Pembangkit Listrik Tenaga Hibrid Surya–Genset Pada Kantor Gubernur Kalimantan Barat,†Jurnal Teknik Elektro Universitas Tanjungpura, vol. 2, no. 1, 2018.

J. Indrawan, K. H. Khwee, and A. Hendro, “Perencanaan Pembangkit Listrik Hibrida Angin – Biomassa – Diesel - Surya Di Desa Penjernang, Kecamatan Sungai Tebelian Kabupaten Sintang, Kalimantan Barat,†Teknik Elektro Universitas Tanjungpura, vol. 1, no. 1, 2022.

V. R. Kossi, “Perencanaan PLTS Terpusat (off-grid) di Dusun Tikalong Kabupaten Mempawah,†Jurnal Teknik Elektro Universitas Tanjungpura, vol. 2, no. 1, 2018.

G. H. Sihotang, “Perencanaan Pembangkit Listrik Tenaga Surya Rooftop di Hotel Kini Pontianak,†Jurnal Teknik Elektro Universitas Tanjungpura, vol. 1, 2019.

G. Nair, D. Ismail, Y. M. Irwanto, M. Irwan, and M. F. Zambak, “Studi Tentang Perspektif Malaysia Terhadap Energi Terbarukan Terutama Pada Energi Surya,†Procedia Energi, vol. 36, 2013.

I. Saputra, “Analisa Daya Pembangkit Listrik Pada Pesisir Pantai Labu Menggunakan Software Homer Tenaga Hibrida. Jurnal Ilmiah Mahasiswa Teknik,†JIMT, vol. 1, no. 3, 2021.

M. A. M. Ramli and A. Hiendro, “Techno-Economic Energy Analysis Of Wind/Solar Hybrid System: Case Study For Western Coastal Area Of Saudi Arabia,†Rewneble Energy, vol. 91, 2016.

K. Sedraou, M. A. M. Ramli, I. M. Mehed, M. Hasbi, and A. Hiendro, “Optimum orientation and tilt angle for estimating performance of photovoltaic modules in western region of Saudi Arabia,†Journal of Renewable and Sustainable Energy, vol. 9, no. 2, 2017.

W. Septiana, “Sel Surya: Struktur & Cara Kerja,†2013.

Pratomo and S. Wahyu, “Analisa Rancang Bangun Penggunaan Sistem Pembangkit Listrik Tenagasurya Dengan PLN Di Muhammadiyah 1 Yogyakarta,†Teknik Elektro Universitas Islam Indonesia, vol. 1, no. 1, pp. 4–7, 2020.

D. Dzulfikar and W. Broto, “Optimalisasi pemanfaatan energi listrik tenaga surya skala rumah tangga. In Prosiding Seminar Nasional Fisika,†E-Journal, vol. 5, 2016.

Z. A. Fikriyadi, “Pembangkit Listrik Tenaga Surya (Plts),†2022.

M. Anwari and A. Hiendro, ““Performance Analysis of PV Energy System in Western Region of Saudi Arabia,†Engineering, vol. 5, no. 1, pp. 62–65, 2013.

H. Hasan, “Perancangan Pembangkit Listrik Tenaga Surya Di Pulau Saugi,†Jurnal riset dan teknologi kelautan, vol. 10, no. 2, pp. 169–180, 2012.

R. P. Pratama, M. N. Qosim, and P. Pawenary, “Perencanaan Pembangkit Listrik Tenaga Surya Dengan Sistem On Grid Sebagai Sumber Energi Listrik Alternatif Di Klinik Mitra Husada Kabupaten Kediri,†ITP, 2020.

I. N. Santhiarsa, I. G. B. W. Kusuma, and W. IGB, “Kajian Energi Surya Untuk Pembangkit Tenaga Listrik,†Teknologi Elektro, vol. 4, no. 1, pp. 29–33, 2005.

A. Hiendro, R. Kurnianto, M. Rajagukguk, and Simanjuntak Y.M, “Techno-economic analysis of wind/solar hybrid system for onshore/remote area in Indonesia, Energy 59,†2013.

E. Widianto and D. B. Santoso, “Analisis Potensi Pembangkit Listrik Tenaga Photovoltaic-Wind Turbines Di Pantai Sedari Karawang,†JRST (Jurnal Riset Sains dan Teknologi), vol. 3, no. 1, pp. 41–47, 2019.

T. Lambert, G. Paul, and L. Peter, “Micropower System Modeling With Homer,†Integration of alternative sources of energy,†Integration of alternative sources of energy, vol. 1, no. 1, pp. 379–385, 2006.

Downloads

Published

2024-06-07

Issue

Section

Articles