DESIGN OF SOLAR PHOTOVOLTAIC SYSTEM AT LANGUAGE CENTER OF TANJUNGPURA UNIVERSITY USING PVSYST
DOI:
https://doi.org/10.26418/j3eit.v11i3.68683Keywords:
Renewable Energy Solar Power Plant Planning, Software PVsyst, Electrical Energy, PLTS off gridAbstract
West Kalimantan is widely available new renewable energy sources (RES) in the form of sufficient solar energy potential to become a Solar Power Plant (SPP) especially for areas that have high solar potential, such as in Pontianak which is located on the equator then, This study evaluates the Solar Power Plant which is located at the UPT Language of Tanjungpura University, Southeast Pontianak District, Pontianak City. The tool used to help solve the problems in this study is the PVsyst software. This tool is used to analyze the planning of SPP. The total load of electrical energy used consists of 6 electronic devices which is often used at the UPT Language of the University of Tanjungpura per day is 80,584 kWh/day, and for the need for electrical energy for 1 year of 29.010 kWh/year. For the results of energy production by a panel with a nominal capacity of 22 kW which is capable of producing a total energy of 32.904 kWh/year. From the results of the economic analysis in this study, the total NPV was obtained Rp.397.823.869, LCC Rp.555.807.731 for a COE of Rp.1.478/kWh for maintenance and operational costs of Rp.4.928.090,and Discount Payback Periode (DPP) 15,1 year is the result of 25 years of economic analysis obtained from the PVsyst software simulation source.
References
Sigit Sukmajati; Mohammad Hafidz., “Perancangan dan Analisis Pembangkit Listrik Tenaga Surya Kapasitas 10 MW On Grid Di Yogyakarta†, Jurusan Teknik Elektro, Sekolah tinggi Teknik PLN , 2015.
Ganda Hartawan Sihotang., “Perencanaan Pembangkit Listrik Tenaga Surya Rooftop Di Hotel Kini Pontianak†, Program Study Teknik Elektro , Fakultas Teknik Universitas Tanjungpura , 2017.
S. Simatupang et al., “Rancang Bangun dan Uji Coba Solar Tracker pada Panel Surya Berbasis Mikrokontroler ATMega16,†J. Keteknikan Pertan. Trop. dan Biosist., vol. 1, no. 1, pp. 55–59, 2013.
M. Bachtiar, “Prosedur perancangan sistem pembangkit listrik tenaga surya untuk perumahan (solar home system),†SMARTek, vol. 4, no. 3, pp. 176–182, 2016.
D. A. Widodo, Suryono, and T. A, “Pemberdayaan Energi Matahari Sebagai Energi Listrik Lampu Pengatur Lalu Lintas,†vol. 2, no. 2, pp. 427–441, 2010.
S. M. AL Rasyid, “Perencanaan Energi Tenaga Surya Sebagai Pembangkit Listrik Tenaga Surya Off-Grid Didesa Batu Sumatra Selatan ,â€Inst. Teknol.-PLN,2020.
Rudi Kurnianto, Ayong Hiendro, Muhammad Ismail Yusuf, “Optimum Orientation Angel For Photovoltaic Arrays at Near Equator Location in Indonesia†2017.
Vember Restu Kossi, “Perencanaan PLTS Terpusat (Off- Grid) Di Dusun Tikalong Kabupaten Mempawahâ€. 2016
BPS.go.id,“RasioElektrifikasi,â€www.bps.id,2020.https://www.bps.go.id/indikator/indikator/indikator/view_data/000/data/1155/sdgs_17 (accesed Jun. 25,2021).
MC PROV RIAU, “PLN Targetkan 2019 Seluruh Desa di Inhu Terlistriki,†www.infopublik.id, 2018
Marcelino, “Perencanaan Pembangkit Listrik Tenaga Surya (PLTS) Terpusat Off-Grid System untuk Pedesaan Terpencil,†pp. 1-51, 2015.
Muhammad Alvin Ridho & Bambang Winardi. (2017). Analisis Potensi Dan Unjuk Kerja Perencanaan Pembangkit Listrik Tenaga Surya(PLTS) Di Departemen Teknik Elektro Universitas Diponegoro. Menggunakan Software PVsyst 6.43.
Gomesh, N., Daut, I., Irwanto, M., & Fitra, M. (2013). ScienceDirect Studi tentang Perspektif Malaysia terhadap Energi Terbarukan Terutama di Energi Matahari. 36, 303–312.
Hutasuhut, A. A., & Chaniago, Y. (2018). Analysis of Hybrid Power Plant Technology Using Data Weather in North Sumatera. 7, 481–485.
H. H. Pradana, “Simulasi Sistem Pembangkit Listrik Hibrid Tenaga Surya Dan Angin Di Fakultas Teknologi Industri†2018.
S. Yuliananda, G. Sarya, and R. Retno Hastijanti, “Pengaruh Perubahan Intensitas Matahari Terhadap Daya Keluaran Panel Surya,†J. Pengabdi. LPPM Untag Surabaya Nop., vol. 01, no. 02, pp. 193–202, 2015.
Umniya Tutthyyibah, “Perencanaan Pembangkit Listrik Tenaga Surya Off Grid Di dusun Bunklotok Desa Batujai Lombok Tengah†2020.
Rudi Kurnianto, Ayong Hiendro, Muhammad Ismail Yusuf, “Optimum Orientation Angel For Photovoltaic Arrays at Near Equator Location in Indonesia†2017.
Muhammad Dendy Fachrezy.H,â€Pembangkit Listrik Tenaga Surya (PLTS) Terpusat Off Grid Di Desa Terpencil Kabupaten Indragiri Hulu†2022.
A.Mermound and B. Wittmer, “Tutorial PVSyst SA,†PVsyt, 2022.
M. H. Anugrah, “Perancangan Pembangkit Listrik Tenaga Surya (PLTS) Grid-Connnected Pada Stasiun Pengisian Bahan bakar Umum (Studi Kasus SPBU 14.282.661 Arifin Ahmad),â€fChemical Inf. Model., vol.53, pp. 1-43,2019.
Vember Restu Kossi, “Perencanaan PLTS Terpusat (Off- Grid) Di Dusun Tikalong Kabupaten Mempawahâ€. 2016
Downloads
Published
Issue
Section
License
Copyright (c) 2023 Journal of Electrical Engineering, Energy, and Information Technology (J3EIT)

This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Copyright of the published articles will be transferred to the journal as the publisher of the manuscripts. Therefore, the author confirms that the copyright has been managed by the publisher.
- Publisher of J3EIT is Universitas Tanjungpura.
- The copyright follows Creative Commons Attribution"“ShareAlike License (CC BY SA): This license allows to Share "” copy and redistribute the material in any medium or format, Adapt "” remix, transform, and build upon the material, for any purpose, even commercially.
Journal of Electrical Engineering, Energy, and Information Technology by Universitas Tanjungpura is licensed under CC BY-SA 4.0