STUDY OF HYBRID SYSTEM BETWEEN PLTD AND PLTS ON LEMUKUTAN ISLAND, BENGKAYANG REGENCY

Authors

  • Syafa Nabila Universitas Tanjungpura
  • Zainal Abidin Universitas Tanjungpura
  • Iqbal Arsyad Universitas Tanjungpura

DOI:

https://doi.org/10.26418/j3eit.v12i1.68966

Keywords:

PLTS Hybrid, Initial investment costs, O&M costs, Lemukutan Island

Abstract

Lemukutan Island is an island administratively located in Bengkayang Regency, West Kalimantan province. Currently, electrical energy on Lemukutan Island is supplied by 1 unit of Diesel Power Plant (PLTD) which has an installed capacity of 140 kW, but PLTD only operates 14 hours/day, from 16.00 to 06.00 WIB. One of the efforts to be able to provide 24-hour electricity services on Lemukutan Island can be done by operating PLTD for 24 hours and alternative efforts by utilizing hybrid Solar Power Plants (PLTS). In a hybrid system between PLTD and PLTS, researchers calculate the capacity of solar panels, calculate the number of batteries, calculate the number of solar charge contoller, and calculate the capacity of the inverter to be used. The economic analysis used only calculates the initial investment cost and O&M costs. Based on the calculation of solar panels used as many as 1473 units with a capacity of 550 Wp, the total watt-peak power is 810 kWp, batteries with a total energy of 2418.9 kWh, Solar Charge Controller using 207 units and 7 inverter units. In the calculation of the total initial investment costs incurred amounted to Rp.10,122,917,594 and investment cost of Rp. 12,497,429/kWp if the installation cost is 0.6%. O&M costs amounted to Rp.101,229,175 while the operational and maintenance costs that must be incurred in accordance with the age of the PLTS project that is run following the life of solar panels for 25 years amounted to Rp. 1,760,485,107.

References

M. I. Arsyad, “Studi Teknis Dan Ekonomis Sistem Energi Hibrida Diesel-Surya-Angin Di Pulau Lemukutan Kabupaten Bengkayang,†Jurnal Teknik Elektro Universitas Tanjungpura, vol. 1, no. 1, 2021.

P. G. Chamdareno and H. Hilal, “Analisa Pembangkit Listrik Tenaga Hybrid PLTD-PLTS di Pulau Tunda Serang Banten,†RESISTOR (elektRonika kEndali telekomunikaSI tenaga liSTrik kOmputeR), vol. 1, no. 1, pp. 35–42, 2018.

S. Nafis, M. Aman, and A. Hadiyono, “ANALISIS KEEKONOMIAN PENERAPAN PEMBANGKIT LISTRIK TENAGA SURYA PADA SISTEM KETENAGALISTRIKAN NIAS; THE ECONOMIC ANALYSIS OF SOLAR SYSTEM POWER PLANT IMPLEMENTATION IN NIAS ELECTRICAL SYSTEM,†Ketenagalistrikan dan Energi Terbarukan, vol. 14, no. 2, pp. 83–94, 2015.

R. Amelia, “Analisis Ekonomi dan Perancangan Pembangkit Hybrid Wind Surya di Desa Parangtritis Yogyakarta,†Institut Teknologi Nasional, Bandung, 2012.

R. E. A. Wibowo, H. Tumaliang, and M. Rumbayan, “Perencanaan Sistem Hybrid Pada Jaringan Kelistrikan Di Rumah Sakit Monompia Kotamobagu,†2022.

A. Windaru and A. H. Budiman, “Analisa biaya pembangkitan pembangkit listrik tenaga panas bumi skala kecil,†Jurnal Energi dan Lingkungan (Enerlink), vol. 13, no. 2, 2017.

A. N. Azizah and S. Purbawanto, “Perencanaan pembangkit listrik tenaga hibrid (PV dan Mikrohidro) terhubung grid (Studi kasus desa Merden, Kecamatan Padureso, Kebumen),†Jurnal Listrik, Instrumentasi, dan Elektronika Terapan, vol. 2, no. 1, 2021.

“4212100143-Undergraduate_Thesisâ€.

A. G. Mahesa and K. H. Khwee, “Studi Perencanaan Pembangkit Listrik Tenaga Surya Sistem Hybrid Sebagai Sumber Energi Alternatif,†Jurnal Teknik Elektro Universitas Tanjungpura, vol. 2, no. 1, 2021.

T. C. Wijaya, M. Facta, and Y. Yuningtyastuti, “Optimasi Potensi Energi Terbarukan Untuk Sistem Pembangkit Listrik Hibrid Di Desa Margajaya Bengkulu Utara Menggunakan Perangkat Lunak Homer,†Transient: Jurnal Ilmiah Teknik Elektro, vol. 3, no. 3, pp. 393–399, 2014.

A. Soba, V. A. Suoth, and H. S. Kolibu, “Optimasi Kapasitas Pembangkit Listrik Tenaga Hybrid (PLTH) di Pulau Bunaken Menggunakan Software HOMER,†Jurnal MIPA, vol. 8, no. 1, pp. 7–12, 2019.

M. F. Fikri and C. Hudaya, “Studi Optimasi Pembangkit Listrik Berbasis Energi Terbarukan pada Sistem Kelistrikan Pulau Nusa Penida Bali,†in Prosiding Seminar Nasional Teknik Elektro UIN Sunan Gunung Djati Bandung, 2019, pp. 265–275.

M. Farid, “Analisa Perancangan Sistem Pembangkit Tenaga Hibrida Di Pantai Seruni, Kabupaten Bantaeng, Sulawesi Selatan,†2018.

I. Susanto, W. Sunanda, and R. Kurniawan, “Analisis Pembangkit Tenaga Diesel di Pulau Celagen,†in Proceedings of National Colloquium Research And Community Service, 2019, pp. 122–126.

R. Irawati and Z. Zuhaidi, “Analisa Pembangkit Listrik Tenaga Hibrida Untuk Pemenuhan Kebutuhan Energi Listrik di Pulau Pramuka,†puslitbangtek Ketenagalistrikan. Energi Baru, Terbarukan. dan Konservasi Energi Cipulir Keb. Lama Jakarta Selatan, 2012.

Downloads

Published

2024-04-30

Issue

Section

Articles