DEVELOPMENT COST ESTIMATION STUDY SOLAR POWER PLANT (PLTS) IN DUSUN MOLO VILLAGE SEREN SELIMBAU BENGKAYANG DISTRICT
DOI:
https://doi.org/10.26418/j3eit.v12i2.76936Keywords:
Offgrid Solar Power Plant, Solar Panel, Renewable Energy, Investment, EconomyAbstract
Currently, the use of energy sources as fuel for power plants still heavily relies on fossil fuels or, in other words, non-renewable energy sources that will gradually deplete and undoubtedly have environmental consequences. This research is conducted in an area that is geographically distant from the PLN (State Electricity Company) grid. Recognizing the need for increased use of Renewable Energy (EBT) and in line with the national target for 2025 set by the Ministry of Energy and Mineral Resources (ESDM), it is expected that the use of EBT can reach 23%. One of the efforts in developing EBT in areas that are not covered by the PLN electricity network is through Solar Power Plants (PLTS). The objectives of the upcoming research include calculating the cost per kilowatt (kW), determining the investment cost for the planned PLTS, and assessing the PLTS capacity to meet the energy demand in Dusun Molo, Bengkayang Regency. Based on the calculation results, the estimated daily electricity demand in Dusun Molo, Seren Selimbau Village, supplied by the PLTS, is 224,223 kWh/day. The power generated by the PLTS to meet the needs of Dusun Molo is 53,283 Wattpeak, while the planned power generation by the PLTS to meet Dusun Molo's requirements is 76,000 Wattpeak. The investment cost for the construction of the PLTS in Dusun Molo is IDR 3,213,751,000, including an 11% Value Added Tax (VAT). After the calculations, the Cost of Energy (COE) or price is determined to be IDR 2,972.00/kWh. This research provides an estimate of the investment cost for the construction of a PLTS in Dusun Molo, Bengkayang Regency.
References
Direktorat Jendral Energi Baru terbarukan dan Konvervasi Energi (EBTKE). (2019). Targer Bauran Energi 2025, Diakses pada 03 November 2020,darihttp://ebtke,esdm,go,id/post/2019/12/06/2419/kejar,target,bauran,energi,2025,dibutuhk an,investasi,ebt,hingga,usd3695,miliar.
ENERGI, Kementerian; MINERAL, Sumber Daya. Matahari Untuk PLTS Di Indonesia. Dikutip dari http://www. litbang. esdm. go. id, 2012.
Alamsyah, T., Hiendro, A., & Abidin, Z. (2019). Analisis Potensi Energi Matahari Sebagai Pembangkit Listrik Tenaga Surya Menggunakan Panel Monocrystalline dan Polycrystalline Di Kota Pontianak dan Sekitarnya. Jurnal Teknik Elektro Universitas Tanjungpura, 2(1).
Manab, A., Rabiula, A., & Matalata, H. (2022). Perencanaan Pembangkit Listrik Tenaga Surya Sistem Off-Grid di Desa Bungku Kecamatan Bajubang Kabupaten Batanghari Jambi. Journal of Electrical Power Control and Automation (JEPCA), 5(2), 61-66.
Rahman, R. (2020). Analisis Perencanaan Pembangkit Listrik Tenaga Surya Offgrid Untuk Rumah Tinggal Di Kota Banjarbaru (Doctoral dissertation, RENALDY RAHMAN).
KOSSI, Vember Restu. Perencanaan PLTS Terpusat (off-grid) di Dusun Tikalong Kabupaten Mempawah. Jurnal Teknik Elektro Universitas Tanjungpura, 2018, 2.1.
SYUKRI, Mahdi, et al. Perencanaan Pembangkit Listrik Tenaga Surya (PLTS) Terpadu Menggunakan Software PVSYST Pada Komplek Perumahan di Banda Aceh. Jurnal Rekayasa Elektrika, 2010, 9.2: 77-80.
Pembangkit Listrik Tenaga Surya Atap Yang Terhubung Pada Jaringan Tenaga Listrik Pemegang Izin Usaha Penyediaan Tenaga Listrik Untuk Kepentingan Umum. Peraturan Menteri Energi Dan Sumber Daya Mineral Republik Indonesia Nomor 26 Tahun 2021, jakarta.
Gunoto, P., & Darmayanti, D. (2019). Perancangan Pembangkit Listrik Tenaga Surya Untuk Proyektor Di Ruang A102 Fakultas Teknik Universitas Riau Kepulauan. Sigma Teknika, 2(2), 131-136.
Foster, R., Ghassemi, M., Cota, A. 2010. Solar Energy Renewable Energy and The Environment. Boca Raton, FL, CRC Press.
Lazou, and Papatsoris. 2000. The Economics of Photovoltaic Stand-Alone Reidential Household : A Case Study for VariousEuropean and Mediterranean Locations. Solar Energy Material & Solar Cells 62 : 411-427.
Wenqiang, L. Shuhua, G. Daxiong, Q., 2004. Techno-Economic Assesment For Off-Grid Hybrid Generation System and Application Prospects in China. World Energy Council. London.
Nafeh, A.E.A., 2009 Design and Economic Analysis of a Stand-Alone PV System to Electrify a Remote Area Household in Egypt. The Open Renewable Energy Journal 2 : 33-37.
Kolhe, M., Kolhe, S., Joshi, J.C. 2002. Economic Viability of Stand-Alone Solar Photovoltaic System in Comparison with Diesel-Powered System for India. Energy Economics 24 : 155-165.
KemESDM, 2014. “Panduan Penyusunan Studi Kelayakan Pembangkit Listrik Tenaga Surya (PLTS) Terpusatâ€. Jakarta : Kementerian Energi dan Sumber Daya Mineral.
Kaltscmitt, Martin, dkk. 2007. Renewable Energy : Technology, Economic and Environment. Germany : Springer-Verlag Berlin Heidelberg
Herliyanso, D., & Rozak, O. A. (2023). Perencanaan Sistem Pembangkit Listrik Tenaga Surya Off-grid Sebagai Suplai Daya Listrik Perpustakaan Universitas Pamulang. ELECTRICES, 5(1), 20-29.
Tamimi, S., Indrasari, W., & Iswanto, B. H. (2016, October). Optimasi sudut kemiringan panel surya pada prototipe sistem penjejak matahari aktif. In Prosiding Seminar Nasional Fisika (E-Journal) (Vol. 5, pp. SNF2016-CIP).
Al-Qutub, R.W.A. 2010. “Treatment of Surface Water by Autonomous Solar-Powered Membrane Cellsâ€(tesis). Palestine : An-Najah National University.
Syafa Nabila, Universitas Tanjungpura, 2023 Studi Sistem Hybrid Antara Pltd Dan Plts Di Pulau Lemukutan Kabupaten Bengkayang.
Downloads
Published
Issue
Section
License
Copyright (c) 2024 Journal of Electrical Engineering, Energy, and Information Technology (J3EIT)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Copyright of the published articles will be transferred to the journal as the publisher of the manuscripts. Therefore, the author confirms that the copyright has been managed by the publisher.
- Publisher of J3EIT is Universitas Tanjungpura.
- The copyright follows Creative Commons Attribution"“ShareAlike License (CC BY SA): This license allows to Share "” copy and redistribute the material in any medium or format, Adapt "” remix, transform, and build upon the material, for any purpose, even commercially.
Journal of Electrical Engineering, Energy, and Information Technology by Universitas Tanjungpura is licensed under CC BY-SA 4.0