PERFORMANCE EVALUATION OF OFF-GRID SOLAR POWER PLANT FOR STREET LIGHTING AT PT. REZEKI PERKASA SEJAHTERA LESTARI WAJOK HULU WEST KALIMANTAN

Authors

  • Rudi Hartono tanjungpura university
  • Yandri Yandri tanjungpura university
  • Ayong Hiendro tanjungpura university

DOI:

https://doi.org/10.26418/j3eit.v12i2.77447

Keywords:

Solar Power Plant Performance Evaluation PT Rezeki Perkasa Sejahtera Lestari

Abstract

This study aims to evaluate the performance and capacity of the Solar Power Plant (PLTS) system that has been installed on charging batteries for street lighting. Before cleaning the surface of the solar panel, the energy produced only reached 707.46Wh, and after cleaning, the energy produced increased to 859.77Wh. However, these results still do not meet the daily energy requirements for a 12-hour battery charge. The research methodology includes analyzing the impact of dust on solar panels, evaluating the performance of PLTS, and calculating daily energy requirements. Based on the PLTS battery capacity of 9600Wh, the maximum energy obtained from charging the battery is still insufficient to power two street lighting lamps for 12 hours. Therefore, an evaluation of the installed PLTS was conducted, resulting in several findings. First, it is necessary to add 11 units of solar panels with a capacity of 455Wp so that the required energy can be met. Second, the capacity of the installed battery is sufficient to meet the energy needs of the lighting. Third, the capacity of the Solar Charge Controller (SCC) needs to be increased to 150Ampere due to the addition of solar panels. Finally, the inverter that has been installed with an output of 1000Watt is adequate for the needs of the system. The results of this evaluation can serve as a basis for improving the performance of the PLTS in order to meet the desired energy needs.

References

M. Arifin, O. Margareta, dan O. F. Trimaryana, “Pengaruh Intensitas Cahaya terhadap Efisiensi Konversi Sel Surya Berbasis Dye-Sensitized Solar Cell (DSSC),†Jurnal Integrasi, vol. 9, no. 1, hlm. 24–27, 2017.

A. Apridalianti Melkias, Abdurrachim, dan B. Yuliarto, “Analisis Evaluasi Kinerja ‘Solar Cell-Hybrid Off Grid’ 18 kWp Gedung Lab.Surya-Teknik Konversi Energi POLBAN,†dalam Industrial Research Workshop and National Seminar, 2015, hlm. 79–87.

Y. F. Silitonga, “Analisa Daya Pembangkit Listrik Tenaga Surya Di Gedung L Universitas Hkbp Nommensen Medan,†2022.

A. Budi Nurcahyono dan A. Natsir, “Evaluasi Dan Perencanaan Kembali PLTS Tipe Rooftop Untuk Backup Catu Daya Listrik Pada Observatorium Geomaagnetik Lombok (OGL) [Evaluation And Replanning Rooftop Pv Power Plant Type For Power Supply Backup In Geomagnetic Observatory Lombok]â€.

C. S. Solanki, Solar Photovoltaic Technology And Systems : A Manual For Technicians, Trainers And Engineers. 2013.

G. Widayana, “Pemanfaatan Energi Suryaâ€.

Panduan Perencanaan, Pembangunan, Operasional Dan Pemeliharaan PLTS Atap. Mitra Hijau, 2021.

D. Purnama Sari, N. Kurniasih, dan A. Yogianto, “Kajian Perencanaan PLTS Terhubung Ke Grid Untuk Melayani Suplai Daya Listrik Di Menara STT-PLN,†Jurnal Sutet, vol. 8, no. 1, 2018.

K. Bimas Permada, I. N. Setiawan, dan I. W. A. Wijaya, “Perancangan Plts Atap Di Kampus Sekolah Tinggi Ilmu Ekonomi Widya Gama Lumajang,†Jurnal Spektrum, vol. 9, no. 1, hlm. 35, 2022.

P. Harahap, “Pengaruh Temperatur Permukaan Panel Surya Terhadap Daya Yang Dihasilkan Dari Berbagai Jenis Sel Surya,†Jurnal Rekayasa Elektrikal dan Energi, vol. 2, no. 2, hlm. 73–80, 2020.

Y. M. S. and M. T. Darno, “Studi Perencanaan Modul Pratikum Pembangkit Listrik Tenaga Surya (PLTS),†Jurnal Teknologi Rekayasa Teknik Mesin diterbitkan oleh Jurusan Teknik Mesin Fakultas Teknik Universitas Tanjungpura Pontianak, vol. 1, no. 1, 2019.

R. A. Diantari, Erlina, dan C. Widyastuti, “Studi Penyimpanan Energi Pada Baterai PLTS,†Jurnal Energi & Kelistrikan, vol. 9, no. 2, hlm. 120–125, 2017.

Suprianto, “Analisa Perhitungan untuk Pemasangan Sistem Pembangkit Listrik Tenaga Surya untuk Solar Home System,†Jurnal Teknik Elektro, vol. 4, no. 1, hlm. 60–67, 2021.

P. R. Utami, Widyastuti, dan M. Wijayanti, “Analisa Perhitungan Pembangkit Listrik Tenaga Surya Untuk Taman Markisa Di Wilayah RT 01/ RW 08 Kelurahan Mampang, Pancoran Mas, Kota Depok,†Jurnal Abdi Masyarakat Multidisiplin, vol. 1, no. 2, hlm. 42–49, 2022.

O. Sensa Ritzky Cinicy, J. Windarta, dan S. Saptadi, “Economic Feasibility Study of Rooftop Solar Power Plant 32 kWp in PT KPJB Office Building, PLTU Tanjung Jati B, Kabupaten Jepara,†Jurnal Energi Baru dan Terbarukan, vol. 4, no. 2, hlm. 97–107, Sep 2023, doi: 10.14710/jebt.2023.17574.

C. Rangkuti, “Perencanaan Pembangkit Listrik Tenaga Surya Di Atap Gedung Harry Hartanto Universitas Trisakti,†Seminar Nasional Cendekiawan, 2016.

J. Windarta, “Perancangan Pembangkit Listrik Tenaga Surya (PLTS) Berbasis Homer Di SMA Negeri 6 Surakarta Sebagai Sekolah Hemat Energi Dan Ramah Lingkungan,†dalam PROSIDING SEMINAR NASIONAL MIPA 2019 Universitas Tidar, 2019, hlm. 21–36.

R. Rahman, “Analisis Perencanaan Pembangkit Listrik Tenaga Surya Offgrid Untuk Rumah Tinggal Di Kota Banjarbaru,†Electric, Electronic, Instrumentation, Control, Telecommunication, vol. 4, no. 1, 2021, [Daring]. Tersedia pada: https://ojs.uniska-bjm.ac.id/index.php/eeict

M. Faris Fardan, S. Dwi Prasetyo, dan B. Kusharjanta, “Amperemeter & Voltmeter DC,†2020.

A. Anggi Prayogi, H. S. Mubarok, dan S. S. Wahyu Pratomo, “Perancangan Sistem Pembangkit Listrik Hybrid (PLN-Solar Cell) Pada Gedung Fakultas Teknik Sipil Dan Perencanaan Universitas Islam Indonesia Menggunakan Homer,†Jurnal Universitas Islam Indonesia.

Downloads

Published

2024-08-30

Issue

Section

Articles