ELECTRICAL INSTALLATION PLANNING IN THE HAJJ DORMITORY BUILDING OF PONTIANAK CITY

Authors

  • Ridho Nur Julhafiz Tanjungpura University

DOI:

https://doi.org/10.26418/j3eit.v13i1.90084

Keywords:

Planning, Building, Electrical Installation, PUIL 2020, SNI

Abstract

The Hajj Dormitory Building in Pontianak City is a new four-story facility designed as a transit hub for Hajj pilgrims in West Kalimantan. This study aims to design a safe, reliable, and standard-compliant electrical installation to support the building's operations. The planning process is based on SNI 03-6197-2020 for lighting installations and PUIL 2020 for cable sizing, protective devices, and voltage drop requirements. The methods used include manual calculations for power requirements, voltage drop simulations using ETAP 21, and electrical installation design using AutoCAD software. The results indicate that the building requires a total power of 310,151 VA. The installation utilizes 2x(4x150 mm ²) cables and a Circuit Breaker (CB) with a 630A rating. A 400 kVA generator set is needed to provide backup power. Voltage drop simulations using ETAP 21 show a value of 0.163% from PLN to the Main Distribution Panel (MDP), which is within the maximum limit set by PUIL 2020 (≤ 4%). This electrical installation plan ensures that the electrical system of the Hajj Dormitory Building operates efficiently and meets safety and reliability standards. The findings of this study can serve as a reference for implementing the building"™s electrical installation.

References

R. C. Andriyan and W. Winarso, “Perancangan Kebutuhan Daya dan Instalasi Listrik Pada Gedung Askrindo Bogor,†J. Ris. Rekayasa Elektro, vol. 3, no. 1, pp. 35–46, Jun. 2021, doi: 10.30595/jrre.v3i1.9671.

Sugianto and A. Muis, “Instalasi Listrik Pada Gedung Bertingkat,†Progr. Stud. Tek. Elektro - ISTN Sinusoida, vol. XXIII, no. 1, pp. 40–49, 2021.Sugianto and A. Muis, “Instalasi Listrik Pada Gedung Bertingkat,†Progr. Stud. Tek. Elektro - ISTN Sinusoida, vol. XXIII, no. 1, pp. 40–49, 2021.

Y. Yusuf, A. Kali, and Y. S. Pirade, “Perancangan Instalasi Listrik Gedung Dinas Pengendalian Penduduk Dan Keluarga Berencana ( P2Kb) Provinsi Sulawesi Tengah,†Foristek, vol. 10, no. 2, 2021, doi: 10.54757/fs.v10i2.41.Y. Yusuf, A. Kali, and Y. S. Pirade, “Perancangan Instalasi Listrik Gedung Dinas Pengendalian Penduduk Dan Keluarga Berencana ( P2Kb) Provinsi Sulawesi Tengah,†Foristek, vol. 10, no. 2, 2021, doi: 10.54757/fs.v10i2.41.

M. Dian, F. T. Pontia W, and M. I. Arsyad, “Study of Electrical Installation Planning At Pratama Jagoi Babang Hospital,†Telecommun. Comput. Electr. Eng. J., vol. 1, no. 2, p. 84, Oct. 2023, doi: 10.26418/telectrical.v1i2.69984.M. Dian, F. T. Pontia W, and M. I. Arsyad, “Study of Electrical Installation Planning At Pratama Jagoi Babang Hospital,†Telecommun. Comput. Electr. Eng. J., vol. 1, no. 2, p. 84, Oct. 2023, doi: 10.26418/telectrical.v1i2.69984.

T. Sutrisno, S. Dinata, and W. A. Nurtiyanto, “Perancangan Panel Distribusi Daya Listrik (SDP) Untuk Gedung Kampus Universitas Sutomo,†Epic J. Electr. Power Instrum. Control, vol. 5, no. 2, p. 177, 2023, doi: 10.32493/epic.v5i2.27538.T. Sutrisno, S. Dinata, and W. A. Nurtiyanto, “Perancangan Panel Distribusi Daya Listrik (SDP) Untuk Gedung Kampus Universitas Sutomo,†Epic J. Electr. Power Instrum. Control, vol. 5, no. 2, p. 177, 2023, doi: 10.32493/epic.v5i2.27538.

Y. Tjandi and H. Mudassir, “Teknik perencanaan instalasi listrik I,†SainETIn, vol. 1, no. 1, p. 1501, 2009.Y. Tjandi and H. Mudassir, “Teknik perencanaan instalasi listrik I,†SainETIn, vol. 1, no. 1, p. 1501, 2009.

A. Nawawi, “PERENCANAAN INSTALASI PENERANGAN PADA BANGUNAN TEMPAT TINGGAL YANG AMAN DAN EFISIEN,†Swara Patra Maj. Ilm. PPSDM Migas, vol. 7, no. 1 SE-Articles, Sep. 2018.A. Nawawi, “PERENCANAAN INSTALASI PENERANGAN PADA BANGUNAN TEMPAT TINGGAL YANG AMAN DAN EFISIEN,†Swara Patra Maj. Ilm. PPSDM Migas, vol. 7, no. 1 SE-Articles, Sep. 2018.

Badan Standardisasi Nasional, “Konservasi Energi pada Sistem Pencahayaan,†Standar Nas. Indones., pp. 1–38, 2020.

P. Van Harten and E. Setiawan, Instalasi Listrik Arus Kuat, 2nd ed. Binacipta, 2002.

E. Universitas, N. Surabaya, A. I. Agung, S. I. Haryudo, and A. C. Hermawan, “ANALISIS AUDIT ENERGI LISTRIK PADA GEDUNG JURUSAN TEKNIK ELEKTRO UNIVERSITAS NEGERI SURABAYA Ary Prastyawan,†pp. 237–243.

S. N. Indonesia, “Persyaratan Umum Instalasi Listrik ( PUIL ) 2020 – Bagian 1 : Pendahuluan , prinsip fundamental dan definisi,†2020.

Sumanto and I. Abdi Bangsa, “Analisis Kinerja Dan Sistem Pemeliharaan Generator Set (Genset) Pada Apartement Green Central City,†Aisyah J. Informatics Electr. Eng., vol. 5, no. 1, pp. 88–97, 2023, doi: 10.30604/jti.v5i1.127.

Downloads

Published

2025-12-13

Issue

Section

Articles