Planning Of Hotel Lighting Installation On Ahmad Yani Street Pontianak
DOI:
https://doi.org/10.26418/j3eit.v13i2.90305Keywords:
Hotel, Electrical Installation Planning, SNI, Lightning, PontianakAbstract
The hotel is one of the solutions for a temporary place for a person/group to stay while they do their needs in the area/city so that the calculation of the lighting installation is needed. The hotel consists of 12 floors standing on a land area of 435.2 meters with a hotel length of 25.6 meters, a width of 17 meters, and has a height of 42.2 meters. The hotel consists of 12 floors, namely the 1st floor functions as a lobby and cafe, the mezzanine floor functions as an office, the 2nd floor functions as a meeting room and hotel management, floors 3-12 typically function as hotel rooms. In the Planning of Hotel Lighting Installation on Jalan Ahmad Yani Pontianak must comply with the Indonesian National Standard (SNI) 2011 and the General Regulation of Electrical Installation (PUIL) 2011. At the planning stage several calculations are carried out, namely, calculating the number of lamps, current conductivity, cross-sectional area, power density, and total load. Based on the results of the calculation and analysis, the number of lamps needed is 907 lamps with a total load required of 21.946 kW. The cross-sectional area used is 2 x 1 x 1.5 mm2 using NYY cable and 4 x 1.5 mm2 using NYM cable.References
P. A. Dermawan, “Studi Evaluasi Perencanaan Instalasi Penerangan Hotel Neo By Aston Pontianak,†Jurnal Teknik Elektro Universitas Tanjungpura, 2017.
D. R. Maulana, Hermawan, and Juningyastuti, “Perencanaan Instalasi Listrik Hotel Chanti Semarang Menggunakan Software Ecodial 4.8,†TRANSIENT: Jurnal Ilmiah Teknik Elektro, vol. 6, no. 3, Sep. 2017.
A. Azmi, “Studi Perencanaan Kebutuhan Instalasi Listrik Di Rumah Sakit Bersalin Jeumpa,†Jurnal Teknik Elektro Universitas Tanjungpura, vol. 6, no. 1, 2018.
A. C. Saputro, “Perancangan Kelistrikan Pada Kondotel Borobudur Blimbing Kota Malang,†Jurnal Universitas Brawijaya, 2015.
N. Khasanah, Karnoto, and Derman, “Perencanaan Instalasi Listrik Gedung Produksi Fashion Teknologi BBPLK Semarang,†Jurnal Teknik Elektro Universitas Semarang, 2020.
Badan Standarisasi Nasional, BSN PUIL 2011, SNI 6197:2011 Konversi Energi Pada Sistem Pencahayaan. Jakarta, 2011.
“Philips LED Catalogur,†Philips, Amsterdam, 2023.
S. Maulana, “Studi Perencanaan Instalasi Penerangan Pabrik Kelapa Sawit Aplikasi : Pabrik Kelapa Sawit Palm Oil Factory (Pof) PT. Sari Lembah Subur Ukui Riau,†J.Ekon, vol. 18, no. 1, Mar. 2018.
A. B. Pradana, “Perancangan Instalasi Listrik Gedung Dinas Pendidikan Kabupaten Wonogiri,†Jurnal Universitas Semarang, 2016.
M. Sutrisno, M. I. Arsyad, and F. T. P. Wigyarianto, “Desain Perencanaan Instalasi Listrik Di Gedung Operasi Dan Bersalin Rumah Sakit Umum Daerah Dr. Agoesdjam Ketapang,†Jurnal Teknik Elektro Universitas Tanjungpura, 2020.
PT. TBK Kabelindo Murni, Power Cable Low Voltage. 2013.
A. Fauzi, M. I. Arsyad, and F. T. P. Wigyarianto, “Evaluasi Perencanaan Sistem Penerangan Hotel Q Kubu Raya Kalimantan Barat,†Jurnal Teknik Elektro Universitas Tanjungpura, 2021.
I. W. D. Pancane, R. M. Silitonga, and I. M. Asna, “Perencanaan Instalasi Listrik di Hotel dan Villa Maua Nusa Penida,†Jurnal Ilmiah Telsinas Elektro, Sipil dan Teknik Informasi, vol. 5, no. 1, pp. 34–53, Apr. 2022, doi: 10.38043/telsinas.v5i1.3664.
Muhaimin, Teknologi Pencahayaan. Bandung: PT Refika Aditama, 2001.
D. A. K. Sari and D. L. B. Taruno, “Pengembangan Modul Perencanaan Instalasi Listrik Pada Bangunan Gedung,†Prodi Pendidikan Teknik Elektro, vol. 8, no. 2, pp. 144–152, Apr. 2018, [Online]. Available: http://journal.student.uny.ac.id/ojs/index.php/elektro
“Cummins 200 KVA Silent (HT 200 CD).â€
Badan Standarisasi Nasional, BSN PUIL 2011, SNI 0225:2011 Persyaratan Umum Instalasi Listrik 2011. Jakarta, 2011.
Badan Standarisasi Nasional, BSN PUIL 2000 Persyaratan Umum Instalasi Listrik. Jakarta, 2000.
Badan Standarisasi Nasional, BSN PUIL 2001, SNI 03-6575-2001 Tata Cara Perancangan Sistem Pencahayaan Buatan Pada Bangunan Gedung. Jakarta, 2001.
F. Junaidi, T. Bini, and H. Rudito, “Studi Tata Letak Komponen Instalasi Penerangan dan Tenaga Pada Gedung Teknik Kimia Kampus 2 Politeknik Negeri Ujung Pandang,†in Seminar Nasional Teknik Elektro dan Informatika, 2020, pp. 29–36.
T. Linsley, Instalasi Listrik Dasar, 3rd ed. Jakarta: Erlangga, 2004.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Journal of Electrical Engineering, Energy, and Information Technology (J3EIT)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors who publish with this journal agree to the following terms:
- Copyright of the published articles will be transferred to the journal as the publisher of the manuscripts. Therefore, the author confirms that the copyright has been managed by the publisher.
- Publisher of J3EIT is Universitas Tanjungpura.
- The copyright follows Creative Commons Attribution"“ShareAlike License (CC BY SA): This license allows to Share "” copy and redistribute the material in any medium or format, Adapt "” remix, transform, and build upon the material, for any purpose, even commercially.
Journal of Electrical Engineering, Energy, and Information Technology by Universitas Tanjungpura is licensed under CC BY-SA 4.0
