THE EFFECTIVENESS OF USING EXCAVATOR IN THE CONSTRUCTION PROJECT OF PT. AGRO PLANKAN LESTARI PALM OIL FACTORY, SEKADAU REGENCY

Authors

  • Danu Suhendra Universitas Tanjungpura, Pontianak
  • Lusiana Lusiana Universitas Tanjungpura, Pontianak
  • Syahrudin Syahrudin Universitas Tanjungpura, Pontianak

DOI:

https://doi.org/10.26418/jts.v24i1.76530

Keywords:

Construction equipment efficiency, Palm oil factory construction, West Kalimantan, Overall Equipment Effectiveness (OEE), Heavy machinery performance

Abstract

A construction project is a series of interrelated activities to achieve specific goals (buildings/construction) within a particular time, cost, and quality constraints. One crucial resource in this context is construction equipment or heavy machinery. West Kalimantan is renowned for its abundant palm oil production, including in Sekadau Regency. Due to the lack of palm oil processing factories, PT. Agro Plankan Lestari constructed a palm oil factory. The research findings indicate that the average performance efficiency of the excavator was 64% (considered good) for both excavators. However, the average Overall Equipment Effectiveness values for both operators were below the tolerance level set by the Japan Institute of Plant Maintenance (JIPM), which is 40%. The average overall equipment effectiveness values of excavator A obtained an average value of 39.82%, and excavator B obtained 41.69%.

References

Arifianty, M. S. & Rumita, R. (2016). Perhitungan dan Analisis Nilai Overall Equipment Effectivity (OEE) Pada Cylinder Head Line PT. Toyota Motor Manufacturing Indonesia Jakarta. Industrial engineering Online Journal, 5 (2).

Arif, N. (2018). Analisa Efektivitas Kinerja Excavator Pada Aktifitas OB Removal Penambangan Batubara. Journal Industrial Manufacturing. 3(2): 79-88.

Ashar & Siti, N.K. (2018). Analisis Efektifitas Alat Berat “Alat Berat†PT.Henrison Iriana Dengan Metode Lcc “Life Cycle Cost†Dan Oee “Overall Eqipment Effectivness. Jurnal Teknik Industri, 4(1): 23-28.

Azzahra, Y., Lusiana, L., Rafie, R., Syahrudin, S., & Nuh, S. M. Time Cost Trade-Off Analysis on Project Acceleration with Additional Working Hours (Overtime)(Case Study: Building Rehabilitation Project on Dekranasda Hall Of West Kalimantan). Jurnal Teknik Sipil, 23(4), 564-571.

Effendi, D. S. H. (2016). Perhitungan kebutuhan alat berat pada pekerjaan tanah proyek pembangunan pabrik precast di sentul. Jurnal Online Mahasiswa (JOM) Bidang Teknik Sipil, 1(1).

Latif, A & Purnomo, R. (2019). Analisa Total Productive Maintenance (TPM) Menggunakan Overall Equipment Effectiveness Di PT.Perkebunan Nusantara VI Ophir. Jurnal Sains Dan Teknologi,.19(2).

Maknunah, L. & Dkk. (2016). Penerapan Overall Equipment Effectiveness (OEE) Untuk Mengevaluasi Kinerja Mesin-Mesin di Stasiun Giling Pabrik Gula Krebet II Malang. Jurnal Teknologi Industri Pertanian, 26 (2): 189-198.

Nuh, S. M., & Michelim, A. S. (2023). Comparison Study Of Installation Costs Of Concrete Culvert To Modular Wells From Polypropylene Panel. Jurnal Teknik Sipil, 23(4), 600-612.

Syahrudin, S., Michelim, S., & Nuh, S. M. (2023). Technical And Productivity Management Study Of Crushing Plant To Achieve The Target Of Split Stone Production In Rock Mining Companies In West Kalimantan. Jurnal Teknik Sipil, 23(3), 307-317.

Syukroni, A. F. (2019). Perhitungan Biaya dan Waktu Pelaksanaan Proyek Pembangunan Hotel aston Kahuripan Sidoarjo. Institut Teknologi sepuluh Nopember. Surabaya.

Wahyudi, R., Ferdana, R. G., & Nugraha, A. T. (2023). Penerapan Metode Overall Equipment Effectiveness (OEE) dan Six Big Losses untuk Mengukur Efektivitas Mesin Packing pada PT. Surya Tsabat Mandiri. Jurnal Optimalisasi, 9(2), 82-89.

Zulfatri Muthi M., & Dkk. (2020). Pengukuran Efektivitas Mesin Dengan Menggunakan Metode Overall Equipment Effectiveness (OEE) dan Overall Resource Effectiveness (ORE) Pada Mesin PL1250 Di PT XYZ. Jurnal Integrasi Sistem Industri, 7(2).

Downloads

Additional Files

Published

2024-04-07