Utilizing the AHSP Method for Cost Estimation in Road Improvement at Jalan Parit Demang
DOI:
https://doi.org/10.26418/jts.v24i4.86435Keywords:
AHSP Method, Cost Estimation, Road Improvement, Infrastructure Development.Abstract
Road infrastructure improvement is one of the important elements in supporting a country's economic development. Accurate cost estimation is key to road construction projects' success, ensuring efficient budgeting and resource allocation. This research uses data from interviews, observations, planning documents, and supporting literature sourced from official government websites. The method used is the Work Unit Price Analysis (AHSP) based on the Minister of PUPR Regulation No. 1 of 2022 to estimate the Cost Budget Plan (RAB) for the improvement project of Jalan Parit Demang. The results obtained show that the total project cost reached IDR 15,754,053,157. Meanwhile, the AHSP method provides a reliable framework for cost estimation; the analysis also emphasizes the importance of regular price data updates and contingency planning to anticipate market volatility. The research findings will improve budget estimation accuracy and resource efficiency in future infrastructure projects.
References
Andriani, R. D., Rahayu, P. P., Apriliyani, M. W., Manab, A., & Sawitri, M. E. (2021). Characterization of Fermented Milk with the Addition of Gembili (Dioscorea esculenta) Flour. Asian Food Science Journal, 20(2), 56-65.
Galuh, P. I. P., Feriska, Y., & Khamid, A. (2023). Perbandingan Menggunakan Analisis Metode SNI dan BOW terhadap Rencana Anggaran Biaya dan Rencana Anggaran Pelaksanaan dalam Pekerjaan Beton (Studi Kasus pada Gedung Perkuliahan STKIP NU Kabupaten Tegal). Era Sains: Jurnal Penelitian Sains, Keteknikan dan Informatika, 1(3), 133-141.
Ibrahim, A. H., & Elshwadfy, L. M. (2021). Factors Affecting the Accuracy of Construction Project Cost Estimation in Egypt. Jordan Journal of Civil Engineering, 15(3), 329–344.
Idayanti, R., Irma, I., & Wahyu, N. (2024). The Impact of Sharia Working Capital Financing and SME Investments on Economic Growth in South Sulawesi. East Asian Journal of Multidisciplinary Research, 3(5), 1875-1898.
Kuncoro, E., Wurarah, R. N., & Erari, I. E. (2024). The Impact of Road Infrastructure Development on Ecosystems and Communities. Social, Ecology, Economy for Sustainable Development Goals Journal, 1(2), 78-90.
Lin, X., & Lu, Y. (2020). Research On Mathematical Model of Cost Budget in the Early Stage of Assembly Construction Project Based on Improved Neural Network Algorithm. Mathematical Problems in Engineering, 2020(1), 3674929.
Mawardi, E., Iskandar, I., Sutanto, H., Sulaiman, M. S., & Hidayat, M. (2023). Analisa Perbandingan Anggaran Biaya dengan Menggunakan Metode BOW, SNI, dan AHSP. Jurnal TESLINK: Teknik Sipil Dan Lingkungan, 5(1), 48-60.
Messah, Y. A., Sina, D. A., & Manubulu, C. C. (2013). Analisa Indeks Biaya untuk Pekerjaan Beton Bertulang dengan Menggunakan Metode SNI 7394-2008 dan Lapangan (Studi Kasus pada Proyek Pembangunan Asrama STIKES CHMK Tahap III). Jurnal teknik sipil, 2(1), 49-62.
Mohmand, Y. T., Mehmood, F., Mughal, K. S., & Aslam, F. (2021). Investigating the Causal Relationship Between Transport Infrastructure, Economic Growth and Transport Emissions in Pakistan. Research in Transportation Economics, 88, 100972.
Mokolensang, V. M., Arsjad, T. T., & Malingkas, G. Y. (2022). Analisis Rencana Anggaran Biaya pada Proyek Pembangunan Rumah Susun Papua 1 di Distrik Muara Tami Kota Jayapura Provinsi Papua. Jurnal Sipil Statik, 9(4), 619-624.
Ratukarangga, Y. A. (2024). Faktor Anggaran Biaya Proyek Konstruksi Terhadap Pembangunan Negara. MENAWAN: Jurnal Riset dan Publikasi Ilmu Ekonomi, 2(2), 134-148.
Rauzana, A. (2018). Uncertainty Variables on Cost Estimation in Project Construction. IOSR Journal of Business and Management, 20(1), 80–86.
Silalahi, Y. I., Masthura, L., & Fahriana, N. (2023). Analisis Faktor-Faktor Penentu Keberhasilan Proyek Konstruksi Berdasarkan Mutu, Biaya dan Waktu. Jurnal Komposit: Jurnal Ilmu-Ilmu Teknik Sipil, 7(2), 233-240.
Soumena, F. Y., Umaima, U., Nurwahida, N., & Syam, D. R. Y. (2024). The Influence of SME Funding and Non-Performing Financing on Indonesia's Economic Growth in 2015-2022. Return: Study of Management, Economic and Business, 3(3), 166-180.
Sunarwadi, H. S. W., Afdholy, A. R., Rudhistiar, D., Sugiantara, I. P., & Naufal, F. (2023). Strategi Efektif dalam Estimasi Biaya Konstruksi Rumah Tinggal dengan Aplikasi Halo Rumah. Prosiding SEMSINA, 4(2), 214-223.
Tangui, M. G., Thambas, A. H., & Malingkas, G. Y. (2024). Perbandingan Metode Standar Nasional Indonesia dan Analisis Harga Satuan Pekerjaan dengan Menggunakan Aplikasi Berbasis Web. Action Research Literate, 8(9), 2575-2589.
Wahyuanto, E., Heriyanto, H., & Hastuti, S. (2024). Study of the Use of Augmented Reality Technology in Improving the Learning Experience in the Classroom. West Science Social and Humanities Studies, 2(05), 700-705.
Zhao, L., Mbachu, J., & Liu, Z. (2020). Identifying Significant Costâ€Influencing Factors for Sustainable Development in Construction Industry Using Structural Equation Modelling. Mathematical Problems in Engineering, 2020(1), 4810136.
Downloads
Published
Issue
Section
License
Copyright (c) 2024 Jurnal Teknik Sipil

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.