SISTEM INFORMASI GEOGRAFIS PENENTUAN SEBARAN LISTRIK DESA KABUPATEN SINTANG
Keywords:
rural electric, mapping, spatial data, analysis, PCA, clustering, composite, reduction, indicators, identification, priorityAbstract
Rural electric distribution program is
one of the steps that taken by the PT. PLN to
divide the electricity to all the remote areas in
Indonesia. Rural electrification program was
also conducted in the area Sintang, so that all
rural areas in Sintang can be electrified. In rural
electric distribution we calculated the group of
villages that should become a list of priorities.
Determination of the villages should be
prioritized based on several indicators, namely
indicators of the number of potential customers,
power demand, power demand projections, as
well as the distance to the village which will
supply power to villages. Mapping and
geographic distribution of management power is
needed to map the distribution of village with
rural electric into a form of spatial data, and
analysis needed in the process of determining the
priority of rural electric distribution. This
research aims to map and manage the
distribution of electricity in villages Sintang into
spatial data and analyze it so it can produce a
priority list of villages in the rural electric
widening. Analysis of composite prioritization is
done by using PCA (Principal Component
Analysis) and the analysis of Clustering to
reduce the variables / indicators determining
priorities and grouping the results of PCA
analysis that can determine the priority of the
village. This system can manage tabular and
spatial data of rural electric that exist in
Sintang, and display them in the form of maps
(spatial data). The system can analyze and
generate electricity distribution priorities based
on rural electric in the selected villages. The
priority result of rural electric is calculated
based on indicators of potential customers,
power demand, power demand projections and
also the distance to rural electric in the selected
villages , as well as priority by all indicators
(composite) are displayed in tabular and spatial
data.
References
OborNews. 2012, Desember. Rasio Elektrifikasi Indonesia. http://obornews.com/6288-beritapemakaian_listrik_di_indonesia.html
Analisa. 2012. PLN Klaim Seluruh Masyarakat Indonesia Bisa Menikmati Listrik 2020.http://analisa.com/pln-klaim-seluruhmasyarakat-indonesia-bisa-nikmati-listrik-di2020.html
Soemartini. 2008. Principal Component Analysis (Pca) Sebagai Salah Satu Metode Untuk Mengatasi Masalah Multikolinearitas. Jurnal Jurusan Statistika.
Badan Pusat Statistik Provinsi Kalimantan Barat. 2013. Kabupaten Sintang Dalam Angka 2012. Sintang: BPS Kab. Sintang.
Arismunandar, A dan Kuwahara Susumu. 1982. Teknik Tenaga Listrik. Jakarta: Pradnya Paramita.
Usulan Pembangunan Listrik Pedesaan Wilayah Kalimantan Barat.2012. Pembangunan Listrik Pedesaan Wilayah Kalimantan Barat Menurut Area Wilayah Kerja Periode Tahun 2013-2017. Sintang: PT.PLN (persero) Kabupaten Sintang
Prahasta, Eddy.2009. Sig : Sistem InformasiGeografis Konsep Konsep Dasar (PerspektifGeodesi & Geomatika). Bandung: Informatika.
Budiyanto, Eko. 2002. Sistem Informasi GeorafisMenggunakan ArcView GIS. Yogyakarta: Andi.
Santoso, Singgih. 2002. Aplikasi SPSS PadaStatistik Multivariat. Jakarta:Alex MediaKomputindo.
Downloads
Published
Issue
Section
License
The author owns the copyright in his paper and agrees to publish his paper to JUSTIN by giving the rights to the first publication of his paper which is simultaneously licensed under the Creative Commons Attribution License, namely the Similar International 4.0 license (CC BY-NC-SA 4.0).

This is a human-readable summary of (and not a substitute for) the license. Disclaimer.
You are free to:Share "” copy and redistribute the material in any medium or format
Adapt "” remix, transform, and build upon the material
The licensor cannot revoke these freedoms as long as you follow the license terms.
Under the following terms:
Attribution "” You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
NonCommercial "” You may not use the material for commercial purposes.
ShareAlike "” If you remix, transform, or build upon the material, you must distribute your contributions under the same license as the original.
No additional restrictions "” You may not apply legal terms or technological measures that legally restrict others from doing anything the license permits.
Notices:
You do not have to comply with the license for elements of the material in the public domain or where your use is permitted by an applicable exception or limitation.
No warranties are given. The license may not give you all of the permissions necessary for your intended use. For example, other rights such as publicity, privacy, or moral rights may limit how you use the material.