Perencanaan Instalasi Pengolahan Air Limbah Rumah Sakit dr. Achmad Diponegoro Putussibau Kabupaten Kapuas Hulu
DOI:
https://doi.org/10.26418/jtllb.v12i1.73478Keywords:
Air limbah, IPAL, lumpur aktif, rumah sakitAbstract
Liquid waste from hospitals is one of the by-products of various activities. This liquid waste contains many hazardous pollutants that pose a danger to hospital occupants, workers, visitors, and the surrounding community. The objectives of the planning for the wastewater treatment plant at RSUD dr. Achmad Diponegoro include designing the IPAL tank, determining the treatment method, calculating the required area in the planning process, and estimating the budget. The results of the design of the wastewater treatment facility at RSUD dr. Achmad Diponegoro use a total water demand of 78 m3/day as the basis for calculations. The wastewater treatment planning at RSUD dr. Achmad Diponegoro Putussibau uses the activated sludge treatment method, supplemented with other tanks to ensure a continuous process. The designed structure consists of seven tank, including a bar screen with an area of 0,200 m2, a collection tank with an area of 0,85 m2, an equalization tank with an area of 2,62 m2, an activated sludge tank with an area of 8,2 m2, a sedimentation tank with an area of 1,60 m2, a disinfection tank with an area of 2,13 m3, and a sludge drying bed with an area of 3 m2. The land area required for the construction of the wastewater treatment plant at RSUD dr. Achmad Diponegoro is 18,6 m2. The total estimated budget for the entire project is approximately IDR 906,500,000.00.
References
Badan Standar Nasional. 2008. SNI 6989-59-2008 tentang Pengambilan Sampel Air Limbah.
Djaja dan Dwi. 2006. Gambaran Pengelolaan Limbah Cair di Rumah Sakit. Jakarta.
Droste, Ronald L. 1997. Theory and Practice of Water and Wastewater Treatment. John Wiley & Sons, Inc. United States of America.
Giyatmi. 2003. Efektivitas Pengolahan Limbah Cair rumah sakit Dokter Sarjito Yogyakarta Terhadap Pemcemaran Radioaktif. Paca Sarjana Universitas Gadjah Mada. Yogyakarta.
Said. 2006. Paket Tekologi Pengolahan Air Limbah Rumah Sakir Umum Daerah Lubuk Basung. Lubuk Basung: Padang.
Hardjosuprato, M. Masduki. 2000. Penyaluran Air Buangan (PAB) Volume II. ITB. Bandung.
Joko, T. 2010. Unit Produksi dalam Sistem Penyediaan Air Minum Pertama. Graha Ilmu. Yogyakarta.
Metcalf & Eddy. 1981. Wastewater Engineering : Collection and Pumping of Wastewater, Mc Graw Hill, Inc. New York.
Metcalf & Eddy. 1991. Wastewater Engineering: Treatment, Disposal and Reuse, Third Edition. McGraw-Hill: New York.
Metcalf & Eddy. 2003. Wastewater Engineering: Treatment and Resource Recovery. 5th edn.
Noviratri, S. 2013. Studi Efektivitas Instalasi Pengolahan Air Limbah (IPAL) dalam Menurunkan Kadar Amonia dan Fosfat Air Limbah di Rumah Sakit RK Charitas. Jurusan Teknik Industri STT Musi. Palembang.
Downloads
Published
Issue
Section
License
Copyright (c) 2024 Jurnal Teknologi Lingkungan Lahan Basah

This work is licensed under a Creative Commons Attribution 4.0 International License.
The articles in this journal are under the copyright of the author of the article. This article is open access from the journal.